1

Advanced 400 kW Chiller Installation Delivers Fifty Thousand Pounds Annual Cost Reduction on Energy and 200 Tonnes CO₂ Saving

News Discuss 
Project Summary Newsome has recently finalised the installation and commissioning of a new 400 kW chiller at a well-known confectionery manufacturing site in York. Designed to strengthen ESG targets, the installation improves system dependability while minimising overall energy usage and CO₂ emissions. https://trackbookmark.com/story22462996/energy-efficient-400-kw-chiller-installation-delivers-fifty-thousand-pounds-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving

Comments

    No HTML

    HTML is disabled


Who Upvoted this Story